Gilson 215 Manual do Utilizador Página 23

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 22
2-7
Installation 2
Plumbing Connections
Plumbing Connections
Transfer Tubing Installation
1 Connect one end of each piece of transfer
tubing to the 444 QuadDilutor. Refer to the 444
QuadDilutor User’s Guide for more information.
2 Locate the level sensing cables (LLD cables)
supplied with the Z-arm.
3 Pass the other end of each transfer tubing
through the open end of an LLD cable casing
nearest the right-angle connector. The tubing
should exit the back of the LLD cable casing
approximately 6.5 cm from the end.
4 Connect each tubing to the top of the isolation
probe holder using a 1/4"-28 nut and ferrule
supplied with the tubing. Firmly tighten this
fitting using the supplied headless nut extender
(part number 49041032) since it holds the probe
in place.
Vista de página 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 111 112

Comentários a estes Manuais

Sem comentários